欧美日韩精品一区二区免费看-欧美日韩精品一区二区三区-欧美日韩精品一区二区三区不卡-欧美日韩精品一区二区三区高清视频-欧美日韩精品一区二区三区视频-欧美日韩精品一区二区三区视频播放

Your location:Home > Products > Products
Products

YCD 50KVA-50KV Oil-immersed test transformer

Views:

Introduction
This series of products are with small volume, light weight, compact structure, functional, strong commonality and convenient use, etc., Especially suitable for power system, industrial and mining enterprises, scientific research departments and all kinds of pressure electric equipment, electric components, insulation material or DC power frequency dielectric strength under high-voltage test. It’s essential for high-voltage test equipment.

Features
YCD series of light AC DC Hipot Tester uses single frame structure of the core type core.Primary winding wrapped around the core,the high-voltage winding outside, This coaxial arrangement reduces the magnetic flux leakage, which increases the coupling between winding . Products made with shell core with a better browser octagonal structure, overall shape looks elegant.

Disclosure of test operation and Notes
Check whether the test products is , ground discharge, and all external connections are clean. To prevent the test voltage was added to the site of the work up.

After a good test of the wiring should be reviewed only after the correct pressure. Should pay particular attention to high-voltage equipment and inspection and to lead, and a safe distance from the operator was test the reliability of case goods grounding, according to security requirements in order to test the contents.

Capacity for large step-up equipment should be slow to prevent the charge current sample burned microamp table. The necessary pressure should be classified, respectively, read voltage levels stable microampere meter readings.

The course of the experiment should be closely monitored by test materials, testing devices, microamp table, in the event of breakdown, blinking anomalies, such as blood pressure should be immediately cut off power supply, and to identify reasons, a detailed record.

Completion of the trial scheme, step-down, cut off the power supply should be after the test materials and test the device itself to fully discharge.

Back To Top

Mobile station QR code
Copyright © Baoding Yuanchuang Electric Power Co., Ltd. All Rights Reserved    
主站蜘蛛池模板: 777色狠狠一区二区三区| 国产精品久久久久国产精品三级 | 亚洲人成亚洲精品| 99久久精品99999久久| 最新地址四虎www4hutv| 夜夜爽毛片| 五月婷婷激情| 日日综合网| 欧美性白人顶级hd| 久久婷婷成人综合色| 精品国产福利在线| 国产精品你懂得| sese在线视频| 在线播放国产一区二区三区| 亚洲国产欧美国产第一区二区三区| 天天射天天操天天色| 日本精品一区二区三区在线| 欧美成人午夜视频免看| 久久国产精品免费看| 国产在线一区二区| 国产 日韩 一区| 91粉色视频在线观看| 婷婷综合激情网| 天天色天天操综合网| 欧美a在线视频| 九九福利影院| 国产久爱青草视频在线观看| www.av毛片| 亚洲国产天堂在线网址| 欧美体内she精视频毛片| 久久夜色精品国产欧美| 国内外一级毛片| 插插插色综合| 一级女人毛片| 天天操天天干天搞天天射| 奇米影视77777| 久久久日本精品一区二区三区| 国产亚洲在线| 99这里只有精品66视频| 亚洲水蜜桃久久综合网站| 色综合伊人色综合网亚洲欧洲|